Project Overview
C & H Fire Protection Ltd was appointed to deliver a two-floor sprinkler fit-out at Level 8 and 9, Redman Place in Stratford, London. The project involved design and installation using existing base build water supplies to provide a compliant fire protection solution for the development.
The works required coordinated delivery due to programme pace, concurrent trade activity and simultaneous delivery across both floors.
Client Requirement
The client required a professionally designed and installed sprinkler system across two floors of a commercial premises, making effective use of the existing base build water supplies.
The programme was tight and demanded strong coordination, efficient planning and precise execution to maintain quality and compliance while fitting into wider site activities.
The brief required full turnkey delivery from design through to testing and commissioning in line with current fire protection standards.
Scope of Works Delivered
- Full sprinkler system design in accordance with LPC Rules and BS EN 12845
- Fabrication of sprinkler pipework and associated components
- Coordination with existing base build infrastructure and water supplies
- Installation of sprinkler pipework and heads across Level 8 and Level 9
- Ongoing coordination with parallel services and site contractors
- Testing to verify performance and system integrity
- Final commissioning of the sprinkler installation
Compliance and Standards
- LPC Rules for Automatic Sprinkler Installations
- BS EN 12845 Fixed firefighting systems - Automatic sprinkler systems - Design, installation and maintenance
Delivery Approach
A primary project challenge was coordinating installation alongside live services and trades while progressing both floors within a short programme. C & H Fire Protection Ltd used structured sequencing, close communication and daily coordination to maintain momentum and installation quality.
- Review of brief and existing base build water supplies
- Detailed design and engineering coordination
- Fabrication for efficient site installation
- Phased installation across Levels 8 and 9
- Coordination with parallel mechanical, electrical and fit-out teams
- Testing and final commissioning in line with compliance requirements
Outcome and Benefits
This project remains ongoing, with delivery progressing across both floors in line with the agreed programme.
- Compliant sprinkler solution designed around existing infrastructure
- Efficient use of base build water supplies
- Strong coordination with concurrent site services and contractors
- Progress across multiple floors within a condensed programme
- Professionally managed delivery aligned with UK fire protection standards
Once complete, the system will provide reliable fire suppression capability, improved property protection and greater confidence in fire safety provision of the commercial space.
Client Confidence Statement
This project demonstrates C & H Fire Protection Ltd's ability to deliver sprinkler installations in fast-moving commercial fit-out environments where coordination, programme control and technical accuracy are critical. By managing design, fabrication, installation, testing and commissioning in full, the team has delivered a dependable and compliant solution tailored to site demands.
C & H Fire Protection Ltd continues to support commercial clients with professionally delivered fire protection systems that combine compliance, efficiency and confidence at every stage of the project.